Traffic update - #kltu 0716 E10, NPE: on-going pipe repair works at KM13.7, near the TNB building -Bangsar, the left lane is being obstructed. expect delays

#kltu 0716 E10, NPE: on-going pipe repair works at KM13.7, near the TNB building -Bangsar, the left lane is being obstructed. expect delays